Hospitality & Multifamily Mirror Programs
Organize your review around room types, specifications, approvals and delivery stages.
Hotel rooms: connect the mirror to the room package
Identify the guestroom types, vanity arrangement, mirror position and lighting task. Provide model or design references, dimensions, wall conditions, power entry and control requirements. State who reviews the design, sample and purchasing package so the approved item can be matched to the room schedule.
Multifamily units: record installation differences
List quantities by unit type and configuration. Show changes in wall build-up, cabinet recess, door direction, power position or accessible service space rather than assuming every unit uses one detail. Map each accepted product to its drawing and installation file.
Approve the specification package before repeating it
Keep the room/unit schedule, full model, selected configuration, drawing revision and sample disposition together. Identify what the sample establishes and any remaining technical or commercial decisions. A room rendering describes the intended appearance; it is not a signed production approval.
Plan delivery and receiving as a separate task
Provide the target project stages, quantities needed at each stage, receiving constraints and identification requirements. Review labels, packing, storage and any phased arrangements with the order terms. Application planning on this page is separate from an authorized record of a completed client project.
Room / unit schedule fields
| Field | Purpose | Example of the information required |
|---|---|---|
| Type / location | Connect a unit to a repeatable product requirement | Room/unit label and installation position |
| Reference / design | Identify the object under review | Full code or design direction; no code is needed for early OEM review |
| Geometry / site | Review fit and installation | W / H; cabinet opening/depth, wall support and door clearance |
| Functions / market | Avoid mismatched electrical requirements | Light/control preferences, power-entry conditions and actual destination |
| Approval | Prevent release from an obsolete drawing | Approver, drawing/sample revision and open items |
| Delivery | Coordinate quantity and receiving | Quantity by phase, room/carton labels and receiving responsibility |
Hospitality requirements
- Room schedule and quantities. Map each room or unit type to the accepted product configuration and quantity. Agree batch identification, receiving constraints and delivery stages before release.
- Specifier, approver and PO responsibilities. Name the responsible reviewer and approver for design, sample and purchasing decisions. Carry the agreed configuration and revision through the quotation, approval record and purchase order.
- Sample and installation requirements. Confirm wall construction, fixing method, electrical supply, connection position and service access. Use the instructions and drawing applicable to the selected model and revision.
Multifamily requirements
- Unit types and configurations. Map each room or unit type to the accepted product configuration and quantity. Agree batch identification, receiving constraints and delivery stages before release.
- Recess depth and door clearance. Check wall build-up, rough opening, cabinet depth and door travel together. Reserve space for wiring and service access before accepting the installation drawing.
- Building and delivery phases. Map each room or unit type to the accepted product configuration and quantity. Agree batch identification, receiving constraints and delivery stages before release.
Approval and hand-off
- Drawing revisions and room references. Map each room or unit type to the accepted product configuration and quantity. Agree batch identification, receiving constraints and delivery stages before release.
- Approved samples and packaging. Match protection, carton markings and validation conditions to the selected mirror or cabinet and its delivery route. Retain the packaging revision and any applicable test record with the order.
- Receiving and batch labels. Map each room or unit type to the accepted product configuration and quantity. Agree batch identification, receiving constraints and delivery stages before release.
Project evidence
- Authorized project information. State which file you need and its intended approval use. Match the model, configuration and manufacturing location, and distinguish public selection material from controlled approval records.
- Scope and disclosure permission. State which file you need and its intended approval use. Match the model, configuration and manufacturing location, and distinguish public selection material from controlled approval records.
- No unverified client logos or results. Project examples must identify the actual product scope and have permission for publication. No customer logo, purchase outcome or performance result is implied by an application illustration.
Related buyer questions
LED Mirror Installation Planning for Projects
Prepare wall, mounting, power-entry, orientation and service-access inputs for an LED mirror or cabinet installation review with Divas.
Read the guide BUYING GUIDERecessed vs. Surface-Mount Medicine Cabinets: Fit and Clearance
Review recessed and surface-mount medicine cabinets by overall size, rough opening, wall depth, door swing and service access before approving a model.
Read the guide

