Risk review

Manufacturing & Quality Review

Connect each capability claim with the relevant factory, process and record.

Define acceptance before checking the product

The accepted drawing, configuration list and sample establish the glass, finish, lighting, controls, mounting, accessories and packaging to inspect. The inspection plan then records each check, its conditions, acceptance criteria and how exceptions are handled.

The recorded lighting-check example

The supplied cabinet-production presentation describes surface/function checks and a four-hour lighting/ageing check for the programme shown. This is a documented process example. The applicable duration and conditions for a new order belong in that order’s inspection plan; this example is not a reliability-life result.

Production inspection and certification serve different purposes

Dimensional, appearance and function checks help assess the manufactured assembly against its accepted baseline. Certification files require a separate check of the named entity, covered model/configuration, factory and destination scope. Keep the corresponding production and certification records distinct.

Release, traceability and repeat-order changes

Before packing, reconcile inspection disposition, product identity, accessories, labels and packaging revision. Keep the model/batch reference with the release record. A changed component, finish, factory or pack should be reviewed against the accepted baseline before a repeat order carries its earlier approval forward.

Quality review by stage

StageObjectWhat to defineSupporting record
Before assemblyGlass/frame/body and bought-in electrical partsAccepted specification, identification and visible-condition checksMaterial/part identity and deviation disposition
During assemblyLight area, fixings, hinges, shelves and electrical layoutDimensions/fit, surface, access and function against the sampleIn-process checks tied to the drawing/BOM
Function / lightingSelected switching, CCT/dimming and other ordered functionsAgreed function checks and applicable electrical test planConditions and results for the chosen assembly
Before packingAppearance, accessory set, labels and product identityInspection disposition against agreed acceptance criteriaRelease record and traceable model/batch references
Change / reorderSubstitution or revision to parts, finish, factory or packagingReview consequences for sample, documents and validationRecorded approval of the changed baseline

Factory and process

Quality checkpoints

Approval and change control