Prepare wall, mounting, power-entry, orientation and service-access inputs for an LED mirror or cabinet installation review with Divas.
A useful installation brief lets the product team and project team review the same wall, mounting and electrical conditions. Gather those inputs before accepting a custom assembly.
Start with the product and the finished site
Installation planning connects the selected mirror or cabinet to the wall and electrical arrangement. Identify the complete model and intended orientation, then use its current installation information. A general guide helps collect project inputs; the applicable product instructions govern the actual assembly.
Provide a wall and mounting layout
Show the finished wall construction, available fixing support, product position, vanity and adjacent fittings. Include the selected mounting arrangement and any installation constraints. For cabinets, add body depth, recess/opening and door movement. For a shaped mirror, define the outline and mounting centre rather than relying on a room rendering.
Locate the power entry and preserve access
Give the destination, project supply and proposed connection position. State whether the project calls for a hardwired or plug-in arrangement, subject to the selected model. Coordinate cable routing, connection access and control location before freezing the product drawing. Qualified project personnel should resolve site electrical requirements using the applicable instructions.
Review repeated installations by room type
For hotels and multifamily buildings, map the product reference and installation conditions to each room or unit type. Identify mirrored layouts, different wall build-ups and any changes to the power position. Keep those differences in the room schedule so one approved sample is not assumed to cover a different installation.
Release a usable installation package
Keep the model/configuration, drawing revision, mounting information and instruction version together. Send the relevant wall elevation, dimensions and unresolved constraints with the inquiry. A change to orientation, mounting or electrical assembly should trigger review of the affected documents before the installation team uses them.
| Input | Project team provides | Product review establishes |
|---|---|---|
| Wall and position | Build-up, fixing support, elevation and adjacent fittings | Applicable mounting arrangement and product clearances |
| Power and controls | Destination, supply, connection position and required behaviour | Selected electrical assembly and instructions |
| Cabinet fit | Body depth, opening, hinge direction and obstructions | Model-specific fit and door/service clearances |
| Release package | Room/model schedule and approved revision | Matching drawing and current installation file |
Related questions
Can we install using a drawing for a similar-looking model?
Use the instructions and drawing applicable to the actual model and configuration. Similar appearance does not establish the same brackets, weight, opening or connection arrangement.
What should the installer receive?
The complete product/configuration reference, accepted mounting or installation drawing, current instructions and the relevant room/site conditions.
Do all rooms using one model share one installation detail?
Only where the relevant product and site conditions match. Record different wall, orientation, door-clearance or power-entry arrangements separately.