China manufacturing
Review Divas manufacturing in Foshan, China: engineering, glass and aluminium processing, mirror/cabinet assembly and supplier-review evidence.
Foshan engineering and manufacturing
The Foshan operation combines product development, glass and aluminium processing, mirror and cabinet assembly, inspection and export packaging. Use the selected product drawing to identify which operations are relevant to your programme.
Factory planning references
The China facility is approximately 12,000 m², with approximately 100 people and six production lines. Company references are approximately 30,000 LED mirrors and 5,000 medicine cabinets per month. These are separate product-group planning figures; order allocation follows the reviewed model mix and production plan.
Evidence for a supplier review
The photographs below show the China glass/profile work areas, assembly and product checks. For a factory review, identify the site address, relevant process, current quality records and accepted sample. Connect the visible operation to the product rather than treating a general factory photograph as a model inspection report.






China supplier-review dossier
| Evidence group | Use in the review | Scope to retain |
|---|---|---|
| Entity / location | Match the actual manufacturer and address | Brand, legal entity and production location are distinct fields |
| Equipment / process | Check that the relevant operation is evidenced | Actual product scope and current process arrangement |
| Sample / specification | Establish the reproducible assembly | Model/configuration, drawing/BOM and accepted sample |
| Quality / compliance | Review the applicable inspection and authority-issued files | Actual factory, model list, destination and version |
| Packaging / shipment | Plan handling and order release | Packing revision, quantity mix and shipping-document requirements |
Review requirements
- Development and engineering review. Share the intended appearance, dimensions, construction and priority requirements. Engineering review resolves feasibility, component choices and trade-offs before the sample and production specification are accepted.
- Relevant manufacturing process. Agree the process or inspection scope for the selected product, including acceptance criteria and responsibility. Retain applicable batch records and resolve deviations before release.
- Factory, product and document scope. Identify the actual manufacturing location and sales destination with the selected product. Review the relevant process and document scope before accepting the proposed supply route.
