OEM development · China & Cambodia manufacturing
info@bathroomledmirror.comRequest documentsSearchDiscuss your program
DIVAS / PROFESSIONAL B2B

Cambodia manufacturing

Review Divas production in Tram Kak, Cambodia: relevant processes, order-mix inputs and model-specific documents for a proposed manufacturing programme.

Tram Kak production within the Divas programme

The Cambodia operation provides glass processing, component preparation, assembly and export manufacturing, supported by Divas engineering. Review the selected mirror or cabinet construction against the processes proposed at this location.

Factory and capacity references

The Tram Kak facility is approximately 8,000 m², with 80+ employees and six lines. The current company planning reference is 30,000 pieces per month. This is a facility reference rather than a commitment for each product group or an allocation to an individual order.

Keep model quantities and the Cambodia order separate

The single-model reference is 50 pieces per model/size. The Cambodia order reference is one 40HQ container, with a proposed mix of models and sizes reviewed against carton dimensions and the loading plan. Both conditions need to be considered when preparing an assortment.

Documents follow the actual manufacturing arrangement

Match the full model, configuration, proposed site and final sales destination to the applicable files. Establish the product and packaging approval baseline for this route. Manufacturing location alone does not establish tariff treatment or eligibility under an origin rule.

Cambodia supplier-review dossier

Evidence groupUse in the reviewScope to retain
Entity / locationMatch the actual manufacturer and addressBrand, legal entity and production location are distinct fields
Equipment / processCheck that the relevant operation is evidencedActual product scope and current process arrangement
Sample / specificationEstablish the reproducible assemblyModel/configuration, drawing/BOM and accepted sample
Quality / complianceReview the applicable inspection and authority-issued filesActual factory, model list, destination and version
Packaging / shipmentPlan handling and order releasePacking revision, quantity mix and shipping-document requirements

Review requirements