Keep the full Divas model, selected configuration and drawing revision aligned across quotations, samples, specifications and repeat orders.
Keep four references together: the complete model, selected configuration, document identity and accepted approval baseline. This makes a quotation or reorder easier to reconcile.
Use the complete reference, then verify the configuration
A complete model code identifies the reference being discussed. It does not replace the selected dimensions, finish, functions or approved drawing. Keep those fields together when requesting a quotation or comparing a sample.
Do not decode an unconfirmed suffix
Copy the full model exactly, including letters, numbers and any agreed suffix. Ask for the applicable code definition where it affects the order. Do not assume a letter means a frame, control, door direction or electrical feature because another reference uses a similar code.
Distinguish the webpage, specification sheet and engineering drawing
A webpage presents the current public record. A downloadable product specification sheet has its own document version. A project drawing or BOM has its own revision and approval status. A recent PDF date alone does not show that a custom drawing has been approved.
Check mismatches before comparing prices or releasing a sample
If a quotation, carton, drawing or sample record uses a different code or revision, identify which field changed and ask the responsible team to reconcile it. Keep the older record for traceability, but state which configuration and revision is the accepted order baseline.
Use the same reference for reorder and change requests
Provide the full model, previous order or approved drawing reference, required quantities and the intended change. Review consequences for components, mounting, documentation, manufacturing location and packaging before repeating the earlier approval.
| Field | Example of what to record | Meaning |
|---|---|---|
| Model | Complete Divas model as shown on the product record | Product reference; no guessed suffix expansion |
| Configuration | Width/height, finish, functions, installation and destination | What the buyer intends to order |
| File identity | Document title, number, issue/version and language | Which public or controlled file is being used |
| Approval baseline | Accepted drawing/BOM revision and sample disposition | Which assembly has been agreed for the order |
Related questions
Does a model code tell me the approved custom dimensions?
Use the model together with the selected configuration and drawing. Do not extract a custom-size approval from digits in the model.
Is a specification PDF version the same as a drawing revision?
No. They identify different documents and can have different update and approval histories.
What should we do when two documents show different references?
Record the mismatch and resolve the intended model/configuration and accepted revision before quotation comparison or production release.
