OEM development · China & Cambodia manufacturing
info@bathroomledmirror.comRequest documentsSearchDiscuss your program
Procurement action

How to Confirm an LED Mirror Model, Suffix and Drawing Revision

Keep the full Divas model, selected configuration and drawing revision aligned across quotations, samples, specifications and repeat orders.

Keep the full Divas model, selected configuration and drawing revision aligned across quotations, samples, specifications and repeat orders.

Keep four references together: the complete model, selected configuration, document identity and accepted approval baseline. This makes a quotation or reorder easier to reconcile.

Use the complete reference, then verify the configuration

A complete model code identifies the reference being discussed. It does not replace the selected dimensions, finish, functions or approved drawing. Keep those fields together when requesting a quotation or comparing a sample.

Do not decode an unconfirmed suffix

Copy the full model exactly, including letters, numbers and any agreed suffix. Ask for the applicable code definition where it affects the order. Do not assume a letter means a frame, control, door direction or electrical feature because another reference uses a similar code.

Distinguish the webpage, specification sheet and engineering drawing

A webpage presents the current public record. A downloadable product specification sheet has its own document version. A project drawing or BOM has its own revision and approval status. A recent PDF date alone does not show that a custom drawing has been approved.

Check mismatches before comparing prices or releasing a sample

If a quotation, carton, drawing or sample record uses a different code or revision, identify which field changed and ask the responsible team to reconcile it. Keep the older record for traceability, but state which configuration and revision is the accepted order baseline.

Use the same reference for reorder and change requests

Provide the full model, previous order or approved drawing reference, required quantities and the intended change. Review consequences for components, mounting, documentation, manufacturing location and packaging before repeating the earlier approval.

Reference fields that should travel together
FieldExample of what to recordMeaning
ModelComplete Divas model as shown on the product recordProduct reference; no guessed suffix expansion
ConfigurationWidth/height, finish, functions, installation and destinationWhat the buyer intends to order
File identityDocument title, number, issue/version and languageWhich public or controlled file is being used
Approval baselineAccepted drawing/BOM revision and sample dispositionWhich assembly has been agreed for the order

Related questions

Does a model code tell me the approved custom dimensions?

Use the model together with the selected configuration and drawing. Do not extract a custom-size approval from digits in the model.

Is a specification PDF version the same as a drawing revision?

No. They identify different documents and can have different update and approval histories.

What should we do when two documents show different references?

Record the mismatch and resolve the intended model/configuration and accepted revision before quotation comparison or production release.

Related buyer questions